0811404742现货
0811404742现货
产品价格:¥6912(人民币)
  • 规格:0811404742现货
  • 发货地:上海
  • 品牌:
  • 最小起订量:1件
  • 诚信商家
    会员级别:标准会员
    认证类型:企业认证
    企业证件:通过认证

    商铺名称:上海心雨机电设备有限公司

    联系人:闫经理(小姐)

    联系手机:

    固定电话:

    企业邮箱:395717253@qq.com

    联系地址:上海市嘉定区德富路1211号205室

    邮编:210000

    联系我时,请说是在泵阀网上看到的,谢谢!

    商品详情
      0811404742现货

      0811404455现货
      0811404710现货


      0811404041现货The final report is delivered as a printed copy, with accompanying data on a CD. Cracks and crack-like data are prioritized by severity for convenient assessment by the pipeline operator.
      0831006003现货
      0811404035现货
      0811404026现货


      0811404603现货
      0811404553现货所有测量和处理任务都在一个软件工具和集成化的硬件平台上完成.
      0831006030现货
      0811404020现货
      0811404742现货
      0831006057现货


      0811404618现货
      0811404304现货
      0811404034现货
      0811404221现货
      0811404658现货
      0811404141现货
      0811404100现货 “General Electric has an impressive history and a strong reputation as a technology company. At the same time, StatoilHydro has developed and been a brave user of a number of innovative technologies and solutions. By cooperating with concrete technology development projects within certain areas, we believe we will mutually benefit. We also intend to share experience within R&D, Innovation and HR practices. This will hopefully stimulate and assist both companies to further improve our ways of doing technology development”, says Margareth Øvrum, Executive Vice President for Technology and New Energy in StatoilHydro.
      0811404553现货
      0811006030现货

      [FILE3]
      0811404634现货
      0811404742现货
      0831006057现货
      0811404300现货
      0811404551现货
      0811404086现货
      0811404409现货
      0811404132现货Recently, GE Oil & Gas completed tests on the highest pressure sour gas re-injection train ever built, which is scheduled for installation at the Kashagan oil field of the North Caspian Sea, off the coast of Kazakhstan. Based on well-proven re-injection train architecture that incorporates a GE Frame 5-2D gas turbine and three BCL centrifugal compressors, the turbo-compression train reached 820 bar pressure during full density tests, topping the former record of 690 bar, also achieved by GE technology.
      0811404304现货
      0811404315现货
      0811404656现货
      0811404140现货

    在线询盘/留言
  • 0571-87774297